Qualified Ecologist
Mr. Jacky Tam (CV 4) possesses over 8 years of experience in environmental study and especially in ecology research.
He has carried out ecological impact assessment and ecology surveys for EIA Projects/Feasibility Study/Ecological Monitor
ing/ BEAM Plus SA5/SS7 ecological assessment projects including vegetation, avifauna and freshwater communi
ties survey. He also worked on various ecological restoration of river/wetland habitats, including marsh habitat
construction in Kam Tin, Yuen Long, Express Railway project. The restored marsh/river habitat partially severed
as water treatment function for polluted water from upper river course (with high domestic pollutants load).
Based on his qualifications and working experiences, Mr. Jacky Tam is proposed as an ecologist.
Academic qualification
BSc (Hons) Environmental Science, The University of Plymouth (United Kingdom)
Higher Diploma in Environmental Resources Management (Hong Kong Institute of Vocational Education)
Professional Qualification
Member of Bird Watch Society of Hong Kong
ISA Certified Arborist
Selected job references for land ecology assessment
Supreme Management Services Limited - Operational Phase Ecological Monitoring for the Proposed Residential
Development with Commercial and GIC Facilities in “Comprehensive Development Area” and “Undetermined” Zones,
Various Lots and Adjoining Government Land in DD107, Sha Po, Kam Tin, Yuen Long - April 2020 to current
Agreement No. CE 78/2020 (WS) Ngau Tam Mei Water Treatment Works and Primary Reservoir Extension Investigation,
Design, and Construction. Ecological Survey. Client: ARUP. 2022.
ESCM Winter Bird Use at Tin Shui Wai Channel 2022 to 2023.
Agreement No. CE 25/2020 (GE) - Landslip Prevention and Mitigation Programme, 2020, Package A, Landslip Prevention
and Mitigation Works and Provision of Emergency Works Services for Natural Terrain Landslides Occurring in Hong Kong
Island West Investigation, Design and Construction. 2022.
Contract No. DP 24/2021 Tree Survey for Drainage Improvement Works in Tai Po. 2022.
Contract No. DC/2019/10 Yuen Long Effluent Polishing Plant Main Works for Stage 1 Eurasian Otter, Night
Roost and Egret Nesting Survey. Client: Paul Y. 2021.
Agreement No. CE41/2013 (EP) Port Shelter Sewerage, Stage 3 Sewerage Works at Po Toi O Environmental
Team Services. Client: AEC. 2020 2022.
Agreement No. DP 03/2021 Landscape Architectural Services for Revitalization Works of Jordan Valley Nullah -
Ecological Services. Ecological Enhancement Proposal and provide general ecological consultancy / advice.
Appendix A
Client: David S.K. Au & Associates Ltd. April 2021 -present.
Consultancy Services on Provision of Ecological Baseline Survey and Monitoring at Ma On Kong River.
Responsible for ecological survey, monitoring and reporting. Client: Hong Kong Productivity Council. 2018
2021.
Contract No. WD/07/2019- Ecological Survey for the Study on River Revitalisation and Flood Attenuation
Facilities for Hung Shui Kiu New Development Area. Client: CEDD. 2019-2020
BEAM Plus SA 5 - Ecology Impact Assessment Residential Development at NKIL 6551 Kai Tak Area 4C, Site 3,
Kai Tak, Kowloon. Survey and preparing SA 5-Ecological Site Appraisal Report.. Survey and preparing SA
5-Ecological Site Appraisal Report. Client: Apex Testing & Certification Ltd. April 2020.
BEAM Plus SA 5 - Ecology Impact Assessment Proposed Residential Redevelopment at R.B.L. 801, No. 3 South
Bay Close, Hong Kong. Survey and preparing SA 5-Ecological Site Appraisal Report. Client: Apex Testing &
Certification Ltd. March 2020.
BEAM Plus SA5 - Ecology Impact Assessment Residential Development at NKIL 6576 Kai Tak Area 4B, Site 1,
Kai Tak, Kowloon. Survey and preparing SA 5-Ecological Site Appraisal Report. Client: Apex Testing &
Certification Ltd. February 2020.
Contract No. WD/06/2019- Ecological Impact Assessment Study for a Potential Housing Development Site at
Chung Yip Road, Yuen Long. Client: CEDD. 2019-2020
Ecological Impact Assessment (EcoIA) for Proposed School cum Recreational Development in Nai Chung.
Client: Ramboll Hong Kong Limited. Dec 2019- Dec 2020.
Contract No. YL/2017/03 Wetland creation - wetland and ecology consultancy services. Client: Sang Hing -
Kuly Joint Venture. 2019-2022.
BEAM Plus SS 7- Hoarding Works for Proposed Residential Development at Kwu Tung North NDA FSSTL 263.
Survey and preparing SA 5 - Ecological Site Appraisal Report. Client: Apex Testing & Certification Ltd. August
2019.
PARK YOHO Ecological Consultancy Services: Avifauna Survey and data preparation (2020-2022) Fairyland,
Client: Fugro.
Programme No. 140KA- Consultancy Services To Carry Out Environmental Impact Assessment For
Construction of Annex Block(s) at Hong Kong Observatory Headquarters, Tsim Sha Tsui. Client: ASD/AEC.
2019.
Tender ND/2019/03 - 古洞北及粉嶺北新發展區第一階段發展塱原自然生態公園。 Supporting contract
Sang Hing - Kuly Joint Venture to bid the project. Provision of ecologists, wetland specialist, and preparing
method statements for translocation of Rose Bitterling and Mussels, Ecological Conservation and Compensation;
and Construction on Constructed / Treatment Wetland and associated Birdhide. July 2019.
BEAM Plus SA5 Ecology (Cingleot Premium Logistics) for a Hong Kong Airport site. Survey and preparing SA
5-Ecological Site Appraisal Report. Client: Apex Testing & Certification Ltd. July 2019.
Applicaion for Small House Development of Lot No. 1082 S.B in D.D . 45 Kai Kuk Shue Ha Village, Sha Tau
Kok, N.T. Impact Assessment; Client: Mr. Lee, 2019.
Contract No: HY/2011/03 Ecological impact mudflat monitoring/survey (quarterly) at Tung Chung; Ecological
monitoring and reporting, Client: Atkins, 2019-2020.
Contract No. NDO 14/2018 Environmental Team for Pre-construction Environmental Monitoring and Audit
Works for Advance anf First Stage Works for Kwu Tung North and Fanling North New Development Areas.
Client: Fugro, 2019-2020.
Agreement No. CE 50/2014 (GE) Landslip Prevention and Mitigation Programme, 2014, Package G, Landslip
Prevention and Mitigation Works - Investigation, Design and Construction, Study Area No.11SW-B/HPSA4,
Below Magazine Gap Road and Above Bowen Road, Provision of Full Time Residential Ecologist for Ground
Investigation WorksVegetation Survey and Protection; Client: CEDD/CMA, 2018-2019.
Architectural Services Department Quotation Contract No. CPM301_13/18: Mui Wo Lai Chi Yuen Extension.
Ecological survey, plant transplantation proposal and other related ET tasks. Client: AEC, 2018-2020.
BEAM Plus SA 5-Ecological Site Appraisal Report For Proposed Residential Development at N.K.I.L. 6549, Off
Hing Wah Street West, Cheung Sha Wan, Kowloon. Client: AEC, 2018.
BREEAM (UK) LE02 & LE04 -Ecological Site Appraisal Report For Refurbishment Works at International
Commerce Centre (ICC): Ecological survey and preparing required submissions. Client: AEC, 2018.
Section 12A Rezoning Application Proposed Rezoning For An Extension Of The Ling To Monastery, Including A
Temple, Columbarium And Access Road, At San Wai, Ha Tsuen, Yuen Long: Ecological Impact Assessment.
Client: Man Fung Industries Holding Ltd., 2018.
BREEAM (UK) LE02 & LE04 -Ecological Site Appraisal Report For Refurbishment Works at 4 Headland Road,
Repulse Bay: Ecological survey and preparing required submissions. Client: AEC, 2018.
Planning Consultancy Services for Sassoon Road Campus Expansion for the Hong Kong University: Ecological
impact assessment. Client: BMT, 2018.
Agreement No. CE/35/2015 (GE) Landslip Prevention and Mitigation Programe, 2015, Package A Landslip
Prevention and Mitigation Works and Provision of Emergency Works Services for Natural Terrain Landslides
Occurring in Mainland East (North) Investigation, Design and Construction: Behind Shuen Wah Chim Uk,
Ting Kok Road, Tai Po (Feature No. 3SE-C/C23): Ecological survey and reporting, Client: CEDD/CMA,
2018-2019.
Wanke (萬科)Building renovation project in Xiong An (雄安), He Bei Province, China: Ecological Baseline
Survey/Condition Report and Suggestion on Plants for Green Design: Client: Biodiversity by Design (UK),
2018.
Section12A rezoning application site Kam Sheung Road, Yuen Longfrom "Agriculture", "Village Type
Development" to "Residential (Group C)": Ecological Impact AssessmentAikon Planing, 2018.
Contract No. NDO/02/2018 Baseline Survey for Golden-Headed Cisticola for Site Formation and Infrastructure
Works for Police Facilities In Kong Nga Po: Ecological Baseline Survey and report. Client: CEDD/AECOM,
2017-2018.
Ecological Impact Assessment for Section 16 Application To Allow Columbarium Use At Lot Nos. 879, 880A1,
880B1, 881, 882, 883, 884, 885, 889RP (Part), 891(Part), 1318, 1326 and 1344(Part) all in D.D. 115 and
adjoining Government Land, Au Tau, Yuen Long. Client: Ramboll 2018.
Agreement No. CE 51/2016 (HY): Route 11 (between North Lantau and Yuen Long Feasibility Study.
Responsible for ecological survey and reporting. Client: Meinhardt. 2018 2020.
Agreement No. CE 36/2011 (HY): Further Study and Preliminary Design for Improvement of Hiram’s Highway
from Marina Cove to Sai Kung Town Investigation Addition Service No.4 Ecology Survey and Ecology
Impact Assessment. Client: Meinhardt. 2018 2020.
BEAM Plus SA 5-Ecological Site Appraisal Report For Proposed Residential Development at N.K.I.L. 6549, Off
Hing Wah Street West, Cheung Sha Wan, Kowloon. Client: AEC, 2018.
BREEAM (UK) LE02 & LE04 -Ecological Site Appraisal Report For Refurbishment Works at International
Commerce Centre (ICC): Ecological survey and preparing required submissions. Client: AEC, 2018.
Contract No.: CPM301_13/18. Mui Wo Lai Chi Yuen Extension Vegetation Survey Report and Transplantation
Proposal. Client: AEC, 2018-2019.
Contract No.: SS G511. Construction of Columbarium at Cape Collinson Road in Chai Wan Special Treatment to
Existing Short-legged Toads and Red Fire Ants. Reporting, capture and relocation. Client: Build King
Construction Limited, 2018-2019.
BREEAM (UK) LE02 & LE04 -Ecological Site Appraisal Report for Refurbishment Works at 4 Headland Road,
Repulse Bay: Ecological survey and preparing required submissions. Client: AEC, 2018.
Section 12A Rezoning Application Proposed Rezoning For An Extension Of The Ling To Monastery, Including A
Temple, Columbarium And Access Road, At San Wai, Ha Tsuen, Yuen Long: Ecological Impact Assessment.
Client: Man Fung Industries Holding Ltd., 2018.
Agreement No. CE/35/2015 (GE) Landslip Prevention and Mitigation Programe, 2015, Package A Landslip
Prevention and Mitigation Works and Provision of Emergency Works Services for Natural Terrain Landslides
Occurring in Mainland East (North) Investigation, Design and Construction: Behind Shuen Wah Chim Uk,
Ting Kok Road, Tai Po (Feature No. 3SE-C/C23): Ecological survey and reporting, Client: CEDD/CMA,
2018-2019.
Project title.: ([RFQ-EMD14033VW]) Consultancy Services on Provision of Ecological Baseline Survey and
Monitoring at Ma On Kong. Responsible for ecological survey, monitoring and reporting. Client: Hong Kong
Productivity Council. 2018 2020.
Section12A rezoning application site Kam Sheung Road, Yuen Longfrom "Agriculture", "Village Type
Development" to "Residential (Group C)": Ecological Impact AssessmentAikon Planing, 2018.
Contract No.: CV/2012/05. Bathing Beach at Lung Mei, Tai Po, supporting of qualified ecologist responsible for
ecological surveys, mitigations, mangrove plantation, fauna relocation. Client: Welcome Construction / CEDD,
HKSAR, 2016-2019.
Section 12A Application for Proposed Amendments to the Ma On Shan Outline Zoning Plan in Support of
Private Residential Development and Primary School at Various Lots and Adjoining Government Land in DD
167, Nai Chung, Ma On Shan: Ecological Impact Assessment, Client/leading consultant: Ramboll Environ Hong
Kong Limited, 2016-2019.
Mountain Bike Training Gound & Expansion of Mountain Bike Trail Net Works in Mui Wo and Chi Ma Wan,
S.L. Employed as independent ecologist responsible for ecological survey, eco report updating, supporting
mountain bike specialist in ecology aspects. Clent: Sheung Moon Construction Ltd., CEDD, HKSAR,
2016-2019.
Contract No. CV/2017/04: Environmental Monitoring of Sediment Disposal to the South of Brothers, East of Sha
Chau and East of Tung Lung Chau: diving monitoring of coral and sea bottom; demersal trawling samples of
fishes and invertebrates. In supporting of EGS/Lam, responsible for on-board sampling supervision, sorting,
taxonomic identification, tissue preparation for chemical testing, data analysis and reporting. Sub-consultant of
EGS. 2018-2022.
Contract No. DP 01/2016 Drainage Improvement Works at North District Package B Investigation Provision
of Services of Ecological Baseline Survey (Contract A) Baseline Ecological Survey and Reporting.
BEAM Plus SA 5 Ecology Impact Assessment for the Redevelopment of 29 Severn Road. Client: Apex Testing
& Certification Ltd. 2017 2018.
Agreement No_ CE 65_2013 (EP): Post-Construction Ecological Monitoring of River Improvement Works in
Upper Lam Tsuen River She Shan River and Upper Tai Po River Investigation. Client: Allied Environmental
Consultants Ltd, July 2014 2017.
Contract No. SPW03/2017: Baseline Ecological Monitoring along Ng Tung, Sheung Yue and Shek Sheung
Rivers for Shei Wu Hui Sewage Treatment Works Further Expansion: Ecological Monitoring and reporting.
Client: Drainage Services Department, 2017.
Rezoning application for various lots and adjoining Government lands in D.D. 39, Ha Wo Hang North I of II:
Ecological Impact Assessment. Client: Eton Property, 2017.
Agreement No. CE 35/2015(GE): Landslip Prevention and Mitigation Programme, 2015, Package A Landslip
Prevention and Mitigation Works and Provision of Emergency Works Services fir Natural Terrain Landslids
Occurring in Mainland East (North) Investigation, Design and Construction Ecological Survey. Client: C M
WONG & ASSOCIATES LTD.
Proposed Residential Redevelopment - At R.B.L. 910 No.29 Severn Road, The Peak, Hong Kong - BEAM Plus
SA 5 - ecological survey and impact assessment. Client: Apex Testing & Certification Ltd.
Environmental Impact Assessment (EIA) Study for Proposed Columbarium Use in Lot Nos. 879, 880A11880B1,
880 to 885, 889RP, 891, 1318, 1326 and 1344 all in DD115, Au Tau, Nam Sang Wai, Yuen Long, N.T.
Ecology. Client: Ramboll Hong Kong Limited.
Contract No. NDO/02/2018: Baseline Survey for Golden-headed Cisticola in Kong Nga Po - Baseline monitoring
for avifauna. Client: AECOM/CEDD, 2018.
Contract No. CV/2015/08: Provision of Universal Access Facilities for Highway Structures Package 1 Contract
3: Tree survey and reporting. Client: Kwan On U-Tech Joint Venture, 2016-2017.
Contract No. CV/2011/01: Site formation and infrastructural works near Tsing Lun Road and Tsz Tin Road in
Area 54, Tuen Mun: Tree survey, reporting and monitoring. Client: China Road and Bridge Corporation,
2015-2017.
Contract No. 3/WSD/15: In-situ Reprovisioning of Sha Tin Water Treatment Works (South Works) Advance
Works: Tree survey and reporting. Client: Ming Hing Ming Hing Civil Vasteam Joint Venture, 2016-2017.
Contract No. GE/2017/01: Landslip Prevention and Mitigation Programme, 2014, Package A, Landslip
Prevention and Mitigation Works: Tree survey and reporting. Client: China Geo-Engineering Corporation, 2017.
Contract No. 13/WSD/11: Replacement and Rehabilitation of Water Mains, Stage 4 Phase 2 Mains in East
Kowloon: Tree survey and reporting. Client: Ming Hing Waterworks Engineering Co., Ltd., 2017.
Contract No. 7/LANDS/15: Slop Maintenance and Improvement Works over Tuen Mun, Yuen Long, North, Tai
Po and Sha Tin Districts: Tree Survey. Client: Fraser Construction Co., Ltd., 2017.
Contract No. HY/2014/14: Retrofitting of Noise Barriers on Tuen Mun Road Fu Tei Section: Tree survey and
reporting. Client: KO-CG JV, 2016-2017.
Contract No. HY/2013/10: Preventive Maintenance Programme of Roadside Man-made slops/ Retaining Walls in
Urban Region (Package A): Tree survey, reporting and monitoring. Client: China Geo-Engineering Corporation,
2016-2017.
Contract No. GE/2014/18: Landslip Prevention and Mitigation Programme, 2012, Package I - Landslip
Prevention and Mitigation Works: Tree survey, reporting and monitoring. Client: Tai Kam Construction
Engineering Co., Ltd., 2016-2017.
Contract No. GE/2013/14: Landslip Prevention and Mitigation Programme, 2008, Package N and 2009 Package
D - Landslip Prevention and Mitigation Works in Nam Chung at West Lantau and Sai Kung: Tree survey,
reporting and monitoring. Client: Tai Kam Construction Engineering Co., Ltd., 2015-2017.
Contract No. 19/HY/2014: Preventive and Mitigation Programme, (2016-2019), Upgrading/Improvement Works
for Roadside Man-made Slopes/Retaining Walls in New Territiries: Tree survey, reporting and monitoring. Client:
Geotech Engineering Ltd., 2016-2017.
Contract No. GE/2014/04: Landslip Prevention and Mitigation Programme, 2011, Package F - Landslip
Prevention and Mitigation Works in Kowloon and New Territories East: Tree survey, reporting and monitoring.
Client: U-Win Construction & Engineering Co., Ltd., 2016-2017.
Contract No. GE/2015/06: Landslip Prevention and Mitigation Programme, 2013, Package D - Landslip
Prevention and Mitigation Works: Tree survey and monitoring. Client: Geotech Engineering Ltd., 2017.
Contract No. GE/2016/01: Landslip Prevention and Mitigation Programme, 2016, Package K - Landslip
Prevention and Mitigation Works in Hong Kong Island, Kowloon, New Territories and Outlying Islands: Tree
survey, reporting and monitoring. Client: China Geo-Engineering Corporation, 2017.
Contract No. GE/2013/31: Landslip Prevention and Mitigation Programme, 2009, Package H - Landslip
Prevention and Mitigation Works in New Territories East: Tree survey, reporting and monitoring. Client: Geotech
Engineering Ltd., 2015-2017.
Contract No. GE/2016/02: Landslip Prevention and Mitigation Programme, 2013, Package B - Landslip
Prevention and Mitigation Works: Tree survey, reporting and monitoring. Client: Geotech Engineering Ltd.,
2016-2017.
Contract No. K1499.A-15C: Slope Improvement Works along EAL Phase 5A: Tree survey and reporting.
Client: Geotech Engineering Ltd., 2016-2017.
Contract No. GE/2014/16: Landslip Prevention and Mitigation Programme, 2012, Package J - Landslip
Prevention and Mitigation Works: Tree survey, reporting and monitoring. Client: Geotech Engineering Ltd.,
2017.
Contract No. KL/2011/02: Landslip Infrastructure Works for Housing Sites adjacent to Lung Ping Road at Tai
Wo Ping: Tree survey and monitoring. Client: Penta-Ocean Construction Co., Ltd., 2015-2017.
Proposed Resident Development at 16-18 Cape Road, Chung Hom Kok, Hong Kong, R.B.L. 837: Tree survey,
reporting and monitoring. Client: Workbase Engineering Limited., 2015-2017.
Extension and Conservation to St. Paul’s Primary Catholic School at Wong Nai Chung Road, Happy Valley
Demolition, Foundation, ELS and Pile Caps Works: Tree survey, reporting and monitoring. Client: In
construction Limited., 2016-2017
Contract Ref.8110030197: Landslip Preventive Works to Selected Hospital Authority Slopes: Tree Survey,
reporting and monitoring. Client: Geotech Engineering Limited., 2016-2017.
Contract No. GE/2014/13: Landslip Prevention and Mitigation Programme, 2012, Package E - Landslip
Prevention and Mitigation Works: Tree survey, reporting and monitoring. Client: Ming Hing Waterworks
Engineering Ltd., 2016-2017.
Contract No. GE/2013/03: Landslip Prevention and Mitigation Programme, 2009, Package G - Landslip
Prevention and Mitigation Works in New Territories West: Tree survey, reporting and monitoring. Client:
Geotech Engineering Ltd., 2015-2016.
Contract No. GE/2013/27: Landslip Prevention and Mitigation Programme, 2011, Package A - Landslip
Prevention and Mitigation Works in Hong Kong Island Batch B: Reporting. Client: China Geo-Engineering
Corporation, 2015-2017.
Contract No. GE/2013/05: Landslip Prevention and Mitigation Programme, 2011, Package D - Landslip
Prevention and Mitigation Works in New Territories, Kowloon and Outlying Islandst: Tree survey, reporting and
monitoring. Client: Geotech Engineering Ltd., 2015-2016.
Contract No. GE/2013/33: Landslip Prevention and Mitigation Programme, 2011, Package E - Landslip
Prevention and Mitigation Works in Hong Kong Island and Outlying Island: Tree survey, reporting and
monitoring. Client: Shun Yuen Construction Co., Ltd., 2015-2017.
Contract No. GE/2012/05: Landslip Prevention and Mitigation Programme, 2010, Package B - Landslip
Prevention and Mitigation Works in Hong Kong Island East: Tree survey, reporting and monitoring. Client:
Fraser Construction Co., Ltd., 2015-2016.
Contract No. GE/2012/11: Landslip Prevention and Mitigation Programme, 2009, Package C - Landslip
Prevention and Mitigation Works in Lantau and Hei Ling Chau: Tree survey, reporting and monitoring. Client:
Kwan On Construction Co., Ltd., 2015-2017.
Contract No. GE/2013/02: Landslip Prevention and Mitigation Programme, 2011, Package J - Landslip
Prevention and Mitigation Works in Kowloon and New Territories: Tree survey, reporting and monitoring. Client:
China Geo-Engineering Corporation., 2015-2016.