Month
Actual Quantities of Inert C&D Materials Generated Monthly
Actual Quantities of C&D Wastes Generated Monthly
Total
Quantity
Generated
Hard
Rock
and
Large
Broken
Concrete
Bituminous
Material
Reused in
the Contract
Reused
in
other
Projects
Disposed as
Public Fill
Imported Fill
Metals
Paper/
cardboard
packaging
Plastics
(see Note
3)
Chemical
Waste
Others, e.g.
general refuse
Monthly Summary Waste Flow Table for 2023 (year)
Project : EP-598/2022 – Mai Po Nature Reserve Infrastructure Upgrade Project
The performance targets are given in the Particular Specification on Environmental Management Plan.
The waste flow table shall also include construction waste that are specified in the Contract to be imported for use at the site.
Plastics refer to plastic bottles/containers, plastic sheets/foam from packaging material.
Broken concrete for recycling into aggregates.
If necessary, use the conversion factor: 1 full load of dumping truck being equivalent to 6.5 m3 by volume.