
Actual Quantities of Inert C&D Materials Generated Monthly
Actual Quantities of C&D Wastes Generated Monthly
Hard
Rock
and
Large
Broken
Concrete
Paper/
cardboard
packaging
Others, e.g.
general refuse
Monthly Summary Waste Flow Table for 2023 (year)
Project : EP-598/2022 – Mai Po Nature Reserve Infrastructure Upgrade Project
The performance targets are given in the Particular Specification on Environmental Management Plan.
The waste flow table shall also include construction waste that are specified in the Contract to be imported for use at the site.
Plastics refer to plastic bottles/containers, plastic sheets/foam from packaging material.
Broken concrete for recycling into aggregates.
If necessary, use the conversion factor: 1 full load of dumping truck being equivalent to 6.5 m3 by volume.