Environmental Team for
EP-598/2022 Mai Po Nature Reserve
Infrastructure Upgrade Project
Monthly Environmental Monitoring and
Audit Report for June 2023
Certified By_____________________________
Joan Choi
(Environmental Team Leader)
REMARKS:
The information supplied and contained within this report is, to the best of our knowledge, correct at the time of printing.
Ka Shing accepts no responsibility for changes made to this report by third parties.
Ka Shing Management Consultancy Ltd. www.ka-shign.net
Unit 2, 13/F Kai Yue Commercial Building, 2C Argyle St,
Mong Kok, Kowloon
Certified By Environmental Team Leader:_____________________
(Joan Choi)
Company: Ka Shing Management Consultancy Ltd.
(Joan Choi)
WWF Hong Kong
Environmental Team for
EP-598/2022 Mai Po Nature Reserve Infrastructure Upgrade Project
Monthly EM&A Report June 2023
.
1
Table of Contents
EXECUTIVE SUMMARY ..................................................................................................................... 3
1. Introduction ............................................................................................................. 3
2. Environmental Monitoring and Audit Progress ...................................................... 3
3. Breaches of Action and Limit Levels ...................................................................... 3
4. Water Quality .......................................................................................................... 3
5. Complaint Log ......................................................................................................... 4
6. Notification of Summons and Successful Prosecutions .......................................... 4
7. Reporting Changes .................................................................................................. 4
8. Future Key Issues .................................................................................................... 4
1. INTRODUCTION ...................................................................................................................... 5
1.1 Background ............................................................................................................. 5
1.2 Purpose of the report ............................................................................................... 5
1.3 Project Organization ................................................................................................ 5
1.4 Summary of Construction Works Undertaken During Reporting Month ............... 6
1.5 Construction Programme ......................................................................................... 6
1.6 Summary of EM&A Requirement........................................................................... 7
2 WATER QUALITY ..................................................................................................................... 8
2.1 Monitoring Requirements ........................................................................................ 8
2.2 Monitoring Equipment ............................................................................................ 8
2.3 Monitoring Procedure .............................................................................................. 9
2.4 Data Management and QA/QC ............................................................................. 10
2.5 Discussion and Recommendations ........................................................................ 10
2.6 Results and Observations ...................................................................................... 10
3 ENVIRONMENTAL SITE INSPECTION ............................................................................. 12
3.1 Solid and Liquid Waste Management Status......................................................... 12
3.2 Site Audits ............................................................................................................. 12
3.3 Implementation Status of Environmental Mitigation Measures ............................ 14
4 ENVIRONMENTAL NON-COMPLIANCE ........................................................................... 15
4.1 Summary of Exceedances...................................................................................... 15
4.2 Summary of Environmental Non-Compliance ...................................................... 15
WWF Hong Kong
Environmental Team for
EP-598/2022 Mai Po Nature Reserve Infrastructure Upgrade Project
Monthly EM&A Report June 2023
.
2
4.3 Summary of Environmental Complaint................................................................. 15
4.4 Summary of Environmental Summon and Successful Prosecution ...................... 15
5 FUTURE KEY ISSUES ........................................................................................................... 16
5.1 Key Issues in the Coming Three Months .............................................................. 16
5.2 Monitoring Schedule for the Next Month ............................................................. 16
6 CONCLUSIONS AND RECOMMENDATIONS ................................................................... 17
6.1 Conclusions ........................................................................................................... 17
6.2 Recommendations ................................................................................................. 17
LIST OF TABLES
Table E 1 Summary Table for EM&A Activities in the Reporting Month
Table E 2 Summary Table for Events Recorded in the Reporting Month
Table 1. 1 Key Contacts of the Project
Table 1. 2 Status of Environmental Licences, Notifications and Permits
Table 2. 1 Summary of Monitoring Parameters
Table 2. 2 Water Quality Monitoring Locations
Table 2. 3 Action/Limit Levels for Water Quality Monitoring
Table 2. 4 Equipment Used in water impact Monitoring
Table 2. 5 Summary of exceedances of the Action Level
Table 2. 6 Detail information of exceedances of the Action Level
Table 3. 1 Observations and Follow Up Action of Site Audit
LIST OF APPENDICES
Appendix A Location of the Project
Appendix B Locations for Water Quality Monitoring
Appendix C Calibration certificates of equipment
Appendix D Environmental Monitoring Schedules
Appendix E The Graphical Presentation of Water Quality Monitoring
Appendix F The Environmental Mitigation Implementation Schedule (EMIS)
Appendix G Waste Generation in the Reporting Month
Appendix H The Summary of Exceedance Record
Appendix I Complaint Log
Appendix J Summary of Successful Prosecution
Appendix K The Tentative Construction Programmes
WWF Hong Kong
Environmental Team for
EP-598/2022 Mai Po Nature Reserve Infrastructure Upgrade Project
Monthly EM&A Report June 2023
.
3
EXECUTIVE SUMMARY
1. Introduction
This is the 1st monthly Environmental Monitoring and Audit (EM&A) Report for the Mai Po
Nature Reserve Infrastructure Upgrade Project No. EP-598/2022. This report was prepared by Ka
Shing Management Consultancy Ltd. (Ka Shing) under “Mai Po Nature Reserve Infrastructure
Upgrade Project No. EP-598/2022” (hereinafter called the “Service Contract”). This report
documents the findings of Environmental Monitoring and Audit (EM&A) work conducted from
1st to 30th June 2023.
2. Environmental Monitoring and Audit Progress
The monthly EM&A programme was undertaken by the ET in accordance with the EM&A Manual.
A summary of the monitoring and audit activities during the reporting period is presented below:
Table E 1 Summary Table for EM&A Activities in the Reporting Month
EM&A Activities
Date
Water Quality Monitoring
Please refer to the Appendix E for more details
Weekly Environmental Site
Inspection
5,12, 19,26 June 2023
3. Breaches of Action and Limit Levels
Summary of the environmental exceedances of the reporting month is tabulated in Table E2.
Table E 2 Summary Table for Events Recorded in the Reporting Month
Environmental
Monitoring
Parameter
No. of non-
project
related
exceedances
Total No. of
non-project
related
exceedances
Total No. of
exceedance
related to the
project
AL
LL
AL
LL
Water Quality
SS
2
2
2
0
0
0
DO
2
2
2
0
0
0
Turbidity
4
4
4
0
0
0
4. Water Quality
All water quality monitoring was conducted as scheduled in the reporting period. During the
reporting month, exceedances of the Action Level and Limit Level of Suspended Solid, Dissolved
Oxygen and Turbidity. were observed. As the site work carried out on the aforesaid dates did not
involve any wet trade works, the exceedances were not considered to be related to the construction
activities. The exceedances may be due to external factors which were not project-related.
WWF Hong Kong
Environmental Team for
EP-598/2022 Mai Po Nature Reserve Infrastructure Upgrade Project
Monthly EM&A Report June 2023
.
4
5. Complaint Log
No environmental complaint was received in the reporting period.
6. Notification of Summons and Successful Prosecutions
No notification of summons or successful prosecutions was received in the reporting period.
7. Reporting Changes
There was no reporting change in the reporting period.
8. Future Key Issues
The major site activities for the coming three months include:
1) Tower Hide Structure building by pre-fabrication module assemble, Roof covering. Flooring
slab.
2) Ramp path Foundation Excavation, Blinding Concreting, Footing Setting-out Form work to
footing, Steel reinforcement, cast in bolt fixing, Structure building.
3) Footpath Protection and Safety signage caution, Pedestal footing work, Pedestal installation,
Wood decking installation.
WWF Hong Kong
Environmental Team for
EP-598/2022 Mai Po Nature Reserve Infrastructure Upgrade Project
Monthly EM&A Report June 2023
.
5
1. INTRODUCTION
1.1 Background
1.1.1 The Mai Po Nature Reserve has served Hong Kong as one of the most valuable ecological assets
in the city, and is managed by the World Wide Fund for Nature Hong Kong (“WWF”). WWF
proposes to update of an existing concrete footpath of about 1.5m wide to a raised wooden
boardwalk of about 1.65m wide, construction of a new three-storey tower hide (TH2) and the
associated access wooden boardwalk of about 156m long and 1.65m wide; and construction of
a new three-storey tower hide (TH3) and the associated access wooden boardwalk of about 85m
long and 1.65m wide. The location of the Project as shown in the Appendix A of this report.
1.1.2 The project site is located in Mai Po Nature Reserve (MPNR) where has been managed by World
Wide Fund for Nature Hong Kong (“WWF”) since 1984. More than 20,000 people per year
visiting the MPNR and growing in visitor numbers is anticipated. Most of the existing facilities
have been in use for more than 20 years, in order to cater for an increasing number of visitors
and providing the good condition of facilities in the future, the upgrade of infrastructure is
proposed. The WWF had completed an Environmental Impact Assessment (EIA) and is the
Permit Holder.
1.1.3 The Project under Mai Po Nature Reserve Infrastructure Upgrade Project (Register No. AEIAR-
233/2022) is approved by the EIA report and later granted an EP. The approved EIA report
described both the construction phase and operational phase.
1.1.4 Ka Shing Management Consultancy Ltd. has been commissioned by the WWF to undertake the
assignment as the Environmental Team (ET) for the Designated Project of Mai Po Nature
Reserve Infrastructure Upgrade Project.
1.1.5 In accordance with the Project EM&A Manual requirements, water quality monitoring, and site
inspections should be covered in this Contract. Overall, the EM&A works follows the
demarcation of monitoring responsibilities.
1.2 Purpose of the report
1.2.1 This is the 1st EM&A Report which summarises the impact monitoring results and audit findings
for the EM&A programme during the reporting period from 1st to 30th June 2023.
1.3 Project Organization
1.3.1 Different parties with different levels of involvement in the Project organization under EP no.:
EP-598/2022 include:
Project Proponent WWF Hong Kong
Contractor Mak Ko Kee Building Construction Ltd
Environmental Team (ET) Ka Shing Management Consultancy Ltd.
WWF Hong Kong
Environmental Team for
EP-598/2022 Mai Po Nature Reserve Infrastructure Upgrade Project
Monthly EM&A Report June 2023
.
6
Independent Environmental Checker (IEC) Ove Arup & Partners Hong Kong Limited
1.3.2 The key personnel contact names and numbers under Mai Po Nature Reserve Infrastructure
Upgrade Project and the other contact names and numbers under WWF (Hong Kong) are
summarised in Table 1.1.
Table 1. 1 Key Contacts of the Project
Party
Role
Contact Person
Phone No.
Fax No.
WWF Hong Kong
Project
Proponent
Mr. Alex WONG
2526 1011
2161 9628
Contractor
(Mak Ko Kee Building
Construction Ltd)
Site Agent
Mr. Kin Hung LAM
2649 1883
2647 7389
Ka Shing Management
Consultancy Ltd.
ETL
Ms. Joan CHOI
2618 2166
2120 7752
Ove Arup & Partners Hong
Kong Limited
IEC
Mr. Ricky CHUI
2268 3437
2268 3380
1.4 Summary of Construction Works Undertaken During Reporting Month
1.4.1 The major site activities undertaken in the reporting month included:
Tower Hide Site set-up, Hoarding Erection, Setting-out, Excavation for Foundation, Blinding
laying, Formwork Erection for Foundation and Steel Reinforcement Fixing for Foundation.
Ramp path Setting-out.
Foot path No works during reporting month.
1.5 Construction Programme
1.5.1 A copy of Contractors’ construction programmes is provided in Appendix K.
1.5.2 A summary of the relevant permits, licences, and/or notifications on environmental protection
for this Project is presented in Table 1.2.
Table 1. 2 Status of Environmental Licences, Notifications and Permits
Permit / Licence No.
Valid Period
Status
From
To
1. Environmental Permit (EP)
EP-598/2022
16 Feb 2022
N/A
Valid
2. Air Pollution Control (Construction Dust) Regulation
Notification no. 439298
02 June 2023
N/A
Notified
WWF Hong Kong
Environmental Team for
EP-598/2022 Mai Po Nature Reserve Infrastructure Upgrade Project
Monthly EM&A Report June 2023
.
7
1.6 Summary of EM&A Requirement
1.6.1 The EM&A programme requires water quality monitoring as well as environmental site audits.
The EM&A requirements are described in the following sections, including:
All monitoring parameters;
Action and Limit levels for all environmental parameters;
Event / Action Plans;
Environmental mitigation measures, as recommended in the Project EIA study final report;
and
Environmental requirements in contract documents.
WWF Hong Kong
Environmental Team for
EP-598/2022 Mai Po Nature Reserve Infrastructure Upgrade Project
Monthly EM&A Report June 2023
.
8
2 WATER QUALITY
2.1 Monitoring Requirements
2.1.1 The Environmental Monitoring and Audit requirements are set out in the approved EM&A
Manual. Water quality was identified as key environmental issues during the construction
phase. A summary of the requirements (Monitoring Parameters, Time and Frequency) for
conducting impact water quality monitoring is presented in the sub-sections below.
Table 2. 1 Summary of Monitoring Parameters
Environmental
Aspect
Parameters
Frequency and period
Water Quality
Water depth
pH
Temperature in
o
C
Salinity in mg/L
Turbidity in NTU
Dissolved Oxygen (DO) in %
saturation and mg/L
Suspended Solids (SS) in mg/L
Oil and Grease (O&G) in mg/L
3 times per week, with
a minimum interval of
36 hours, when
foundation works are
carried out at TH2 and
TH3
2.1.2 According to the approved EM&A Manual, water quality monitoring should be performed at
designated monitoring stations. Layout plans showing the approved monitoring locations are
attached in Appendix B. Details regarding the two designated water quality monitoring
stations are shown in Table 2.2 below:
Table 2. 2 Water Quality Monitoring Locations
LOCATION
EASTING
NORTHING
Sluice Gate 7
822107
839868
Sluice Gate 19
821344
838681
2.2 Monitoring Equipment
2.2.1 DO and water temperature should be measured in-situ by a DO/temperature meter. The
equipment should be portable and weather proof using a DC power source. It should have a
membrane electrode with automatic temperature compensation complete with a cable. The
equipment should be capable of measuring:
• A DO level in the range of 0-20 mg/l and 0-200% saturation; and
• A temperature of between 0 and 45 degree Celsius.
WWF Hong Kong
Environmental Team for
EP-598/2022 Mai Po Nature Reserve Infrastructure Upgrade Project
Monthly EM&A Report June 2023
.
9
2.2.2 A portable pH meter capable of measuring a range between 0.0 and 14.0 should be provided
to measure pH under the specified conditions (e.g. Orion Model 250A or an approved similar
instrument) according to the Standard Methods, APHA.
2.2.3 Turbidity should be measured in situ by the nephelometric method. The instrument should be
portable and weatherproof using a DC power source complete with cable, sensor and
comprehensive operation manuals. The equipment should be capable of measuring turbidity
between 0-1000 NTU.
2.2.4 A water sampler, consisting of a transparent PVC or glass cylinder of a capacity of not less
than two litres which can be effectively sealed with cups at both ends should be used.
2.2.5 In-situ monitoring instruments should be checked, calibrated and certified by a laboratory
accredited under HOKLAS or other international accreditation scheme before use, and
subsequently re-calibrated at 3 monthly intervals.
Table 2. 3 Action/Limit Levels for Water Quality Monitoring
Parameter
Performance
Criteria
Monitoring Location
Sluice Gate 7
Sluice Gate 19
Dissolved Oxygen (mg/L)
Action Level
2.85
2.47
Limit Level
2.83
2.45
Suspended Solids (mg/L)
Action Level
99.6
120.3
Limit Level
107.9
121.7
Turbidity (NTU)
Action Level
47.1
122.2
Limit Level
47.2
122.8
2.2.6 Equipment used in water quality monitoring is summarized in Table below. Calibration
certificates of equipment used are attached in Appendix C.
Table 2. 4 Equipment Used in water impact Monitoring
Environmental Aspect
Equipment
Model
Water Quality
Multifunctional Meter
Pro DSS
2.3 Monitoring Procedure
2.3.1 Field measurement procedures for each set of the water quality measurement are as follows:
i. The DO probe of the multifunctional meter is checked by wet bulb method; the pH and
turbidity probes are checked against standard solutions. Record the checking result;
WWF Hong Kong
Environmental Team for
EP-598/2022 Mai Po Nature Reserve Infrastructure Upgrade Project
Monthly EM&A Report June 2023
.
10
ii. Record the field condition including weather conditions and any other potential source
of interference;
iii. Lower the sampler into water body and rinse it with water in the target water body;
iv. Fill the sampler until adequate sample is collected. Replicate sample at each monitoring
location is required;
v. Rinse the bottles by the sample before transferring samples into containing bottles;
vi. Rinse the probe of multimeter with distilled water;
vii. Measure and record temperature, turbidity, pH value and DO of each bottle of sample;
viii. Bottles containing sample is stored temporarily in insulation box with ice until reaching
the laboratory.
2.3.2 The water samples shall be delivered to a HOKLAS laboratory as soon as possible for
analysis, which shall start the next working day after the collection of samples. Analyses shall
follow standard methods as described in APHA Standard Methods for the Examination of
Water and Wastewater, 19th Edition, unless otherwise specified (APHA 2540D for SS and
APHA 5520C for O&G). The QA/QC details shall be in accordance with the requirements
of HOKLAS.
2.4 Data Management and QA/QC
2.4.1 The baseline monitoring data were handled by the ET’s in-house data recording and
management system. Laboratory responsible for laboratory analysis would follow QA/QC
requirements as set out under HOKLAS scheme.
2.5 Discussion and Recommendations
2.5.1 The monitoring of water quality was conducted during typical wet season in Hong Kong.
2.5.2 Review of the conditions may need to be conducted regularly, in particular during weather
condition changes. If the changes in baseline conditions are evident, the environmental
performance criteria should be re-established by agreement of the ER and IEC and submitted
to EPD for endorsement.
2.6 Results and Observations
2.6.1 All water quality monitoring was conducted as scheduled in the reporting month. The
water quality monitoring schedule for this reporting month is shown in Appendix D.
2.6.2 The monitoring results and graphical presentation of water quality monitoring at the
monitoring stations are shown in Appendix E.
WWF Hong Kong
Environmental Team for
EP-598/2022 Mai Po Nature Reserve Infrastructure Upgrade Project
Monthly EM&A Report June 2023
.
11
2.6.3 During the reporting month, exceedances of the Action Level and Limit Level of Dissolved
Oxygen, Suspended Solids and Turbidity were observed. Detail is summarized as below:
Table 2. 5 Summary of exceedances of the Action Level
Environmental
Monitoring
Parameter
No. of non-project
related
exceedances
Total No. of
non-project
related
exceedances
AL
LL
Water Quality
SS
2
2
2
DO
2
2
2
Turbidity
4
4
4
Table 2. 6 Detail information of exceedances of the Action Level and Limit Level
Date
Parameter of
Exceedances
Monitoring Location
Sluice Gate 7
Sluice Gate 19
15 June 2023
Suspended Solids
130, 170
Not Applicable
17 June 2023
Suspended Solids
160, 160
Not Applicable
17 June 2023
Turbidity
211, 213
Not Applicable
21 June 2023
Turbidity
73.3, 73.4
Not Applicable
28 June 2023
Turbidity
52.7, 52.8
Not Applicable
30 June 2023
Turbidity
79.6, 79.7
Not Applicable
30 June 2023
Dissolved Oxygen
2.13, 2.15
2.21, 2.19
2.6.4 As the site work carried out on the aforesaid dates did not involve any wet trade works, the
exceedances were not considered to be related to the Project. The exceedances may be due
to external factors which were not project-related. Details of the site work refer to Appendix
H.
WWF Hong Kong
Environmental Team for
EP-598/2022 Mai Po Nature Reserve Infrastructure Upgrade Project
Monthly EM&A Report June 2023
.
12
3 ENVIRONMENTAL SITE INSPECTION
3.1 Solid and Liquid Waste Management Status
3.1.1 In accordance with the EM&A Manual, waste management was audited during weekly site
audit to determine if wastes are being managed in accordance with the Waste Management
Plan (WMP) prepared for the Project and the relevant legislative and contractual
requirements. Waste management practice including waste handling, storage, transportation
and disposal were audited.
3.1.2 Proactive measures have been undertaken to make use of construction and demolition (C&D)
materials to minimize the waste generated. On-site sorting and screening of excavated
materials have been carried out to recover any recyclable portions. Inert C&D materials were
used on-site for backfilling works.
3.1.3 The Contractor is advised to minimize the wastes generated through the recycling or reusing.
All mitigation measures stipulated in the EM&A Manual and waste management plans shall
be fully implemented. The status of waste flow generation are summarised in Appendix G.
3.2 Site Audits
3.2.1 Site audits were carried out by ET on weekly basis to monitor the timely implementation of
proper environmental management practices and mitigation measures on the Contract site.
3.2.2 Site audits were conducted by ET with the representative of the client’s Representative and
the Contractor on 5, 19 June 2023 in the reporting month. Joint site audits with the
representative of the Client representative, the Contractor and IEC were carried out on 12
and 26 June 2023.
3.2.3 During site inspections in the reporting month, no non-compliance was identified. The
observations and recommendations made during the audit sessions are summarised in Table
3.1.
Table 3. 1 Observations and Follow Up Action of Site Audit
Parameters
Date
Observations
Follow Up Action
Air Quality
5/6/2023
The NRMM label for the excavator is
missing. Please ensure the label is
properly demonstrated.
The NNRM label has been
displayed for the excavator.
12/6/2023
Imposition of speed controls for vehicles
on Site.
Imposition of speed controls for
vehicles on Site.
WWF Hong Kong
Environmental Team for
EP-598/2022 Mai Po Nature Reserve Infrastructure Upgrade Project
Monthly EM&A Report June 2023
.
13
12/6/2023
Use of approved non-road mobile
machinery (NRMM) for all site works
areas.
The NNRM label has been
displayed for the excavator.
19/6/2023
Imposition of speed controls for vehicles
on Site.
Imposition of speed controls for
vehicles on Site.
19/6/2023
Use of approved non-road mobile
machinery (NRMM) for all site works
areas.
The NNRM label has been
display for the excavator.
26/6/2023
Use of approved non-road mobile
machinery (NRMM) for all site works
areas.
The NNRM label has been
display for the excavator.
Construction
Noise Impact
--
No environmental deficiency was
identified during the reporting month.
--
Water Quality
12/6/2023
Perimeter channels at site boundaries shall
be provided to intercept storm runoff from
outside the works areas so that it will not
wash across the works areas and to direct
all site runoff only into adjacent drained
geiwai.
Perimeter channels at site
boundaries has been provided
to intercept storm runoff from
outside the works areas so that
it will not wash across the
works areas and to direct all
site runoff only into adjacent
drained geiwai.
12/6/2023
A perimeter bund has been constructed
around the work sites for TH2 and TH3 to
ensure that any runoff generated from
within these sites is discharged only into
the adjacent drained geiwai.
A perimeter bund has been
constructed around the work
sites for TH2 and TH3 to ensure
that any runoff generated from
within these sites is discharged
only into the adjacent drained
geiwai.
12/6/2023
Tarpaulin covering the perimeter bund to
prevent construction site runoff leakage
through sand bags.
Tarpaulin has been covering the
perimeter bund to prevent
construction site runoff leakage
through sand bags.
19/6/2023
Perimeter channels at site boundaries shall
be provided to intercept storm runoff from
outside the works areas so that it will not
wash across the works areas and to direct
all site runoff only into adjacent drained
geiwai.
Perimeter channels at site
boundaries has been provided to
intercept storm runoff from
outside the works areas so that it
will not wash across the works
areas and to direct all site runoff
only into adjacent drained
geiwai.
19/6/2023
Tarpaulin covering the perimeter bund to
prevent construction site runoff leakage
through sand bags.
Tarpaulin has been covering the
perimeter bund to prevent
construction site runoff leakage
through sand bags.
Waste/
Chemical
Management
12/6/2023
The Contractor shall ensure that different
types of wastes are segregated on-site and
stored in different containers, skips or
stockpiles to facilitate reuse/recycling of
waste and, as the last resort, disposal at
different outlets.
The Contractor has been ensured
that different types of wastes are
segregated on-site and stored in
different containers, skips or
stockpiles to facilitate
reuse/recycling of waste and, as
the last resort, disposal at
different outlets.
19/6/2023
The Contractor shall ensure that different
types of wastes are segregated on-site and
stored in different containers, skips or
stockpiles to facilitate reuse/recycling of
The Contractor has been ensured
that different types of wastes are
segregated on-site and stored in
different containers, skips or
stockpiles to facilitate
WWF Hong Kong
Environmental Team for
EP-598/2022 Mai Po Nature Reserve Infrastructure Upgrade Project
Monthly EM&A Report June 2023
.
14
waste and, as the last resort, disposal at
different outlets.
reuse/recycling of waste and, as
the last resort, disposal at
different outlets.
Landscape and
Visual
--
No environmental deficiency was
identified during the reporting month.
--
Ecology
5/6/2023
Install a 2m-high solid, opaque screen
around works areas.
Install a 2m-high solid, opaque
screen around works areas.
Permit
/Licences
--
No environmental deficiency was
identified during the reporting month.
--
Others
--
--
--
3.3 Implementation Status of Environmental Mitigation Measures
3.3.1 According to the EIA Report, Environmental Permit and the EM&A Manual of the Project,
the mitigation measures detailed in the documents are recommended to be implemented
during the construction phase. An updated summary of the Environmental Mitigation
Implementation Schedule (EMIS) is provided in Appendix F.
3.3.2 During site inspections in the reporting month, the Contractor’s readiness with the mitigation
measures during dry season against dust emission was found generally satisfactory despite
some observations/recommendations as detailed above were raised.
3.3.3 Waste generated from this Project includes inert C&D materials and non-inert C&D materials.
Non-inert C&D materials are made up of general refuse and waste that cannot be reused or
recycled and has to be disposed of at the designated landfill sites. The amount of wastes
generated by the construction works of the Project during the reporting month is shown in
Appendix G.
WWF Hong Kong
Environmental Team for
EP-598/2022 Mai Po Nature Reserve Infrastructure Upgrade Project
Monthly EM&A Report June 2023
.
15
4 ENVIRONMENTAL NON-COMPLIANCE
4.1 Summary of Exceedances
4.1.1 All water quality monitoring was conducted as scheduled in the reporting period. During
the reporting month, exceedances of the Action Level and Limit Level of Suspended Solids,
Dissolved Oxygen and Turbidity. were observed. As the site work carried out on the
aforesaid dates did not involve any wet trade works, the exceedances were not considered
to be related to the Project. The exceedances may be due to external factors which were not
project-related.
4.1.2 Should the monitoring results of the environmental monitoring parameters at any designated
monitoring stations indicate that the Action / Limit Levels are exceeded which are suspected
to be project related events, the actions in accordance with the Event and Action Plans will
be carried out. The summary of exceedance record in reporting month is shown in Appendix
H.
4.2 Summary of Environmental Non-Compliance
4.2.1 No environmental non-compliance was recorded in the reporting month.
4.3 Summary of Environmental Complaint
4.3.1 In accordance with the EM&A Manual, complaints should be referred to the ET for action.
During the complaint investigation works, the ET and IEC as established according to EP
can carry out Ad-hoc site inspections to identify the source of the complaint, review the
effectiveness of the Contractor’s remedial measures and the updated situation once received
the complaint. In addition, additional monitoring and audit can also be arranged immediately
to verify the situation if necessary. ET and IEC will also oversee the circumstances that
leading to the complaint do not recur. Moreover, ET and IEC can cooperate efficiently with
the Contractor on site for completion of the investigation.
4.3.2 There was no environmental complaint received in the reporting month.
4.4 Summary of Environmental Summon and Successful Prosecution
4.4.1 There was no successful environmental prosecution or notification of summons received
since the Project commencement.
WWF Hong Kong
Environmental Team for
EP-598/2022 Mai Po Nature Reserve Infrastructure Upgrade Project
Monthly EM&A Report June 2023
.
16
5 FUTURE KEY ISSUES
5.1 Key Issues in the Coming Three Months
5.1.1 The tentative construction programmes for the Project are provided in Appendix K. The
major construction activities undertaken in the coming three months will include:
- Water Quality Monitoring
- Construction of footings
- Construction of wooden boardwalk
- Installation of prefabricated panels and structural frames of TH2 and TH3
5.1.2 With reference to the tentative construction programmes including the indication of coming
three months construction site activities in Appendix K, potential environmental impacts
arising from the above construction activities are mainly associated with water quality,
waste management, landscape and visual and ecology. The foreseeable environmental
impacts were taken into consideration of the planned mitigation measures in the coming
months.
5.2 Monitoring Schedule for the Next Month
5.2.1 The tentative environmental monitoring schedule for the next month is shown in Appendix
D.
WWF Hong Kong
Environmental Team for
EP-598/2022 Mai Po Nature Reserve Infrastructure Upgrade Project
Monthly EM&A Report June 2023
.
17
6 CONCLUSIONS AND RECOMMENDATIONS
6.1 Conclusions
6.1.1 This Monthly EM&A Report presents the EM&A work undertaken in June 2023 in
accordance with EM&A Manual.
6.1.2 Environmental site inspections were conducted on 5,12,19,26 June 2023 by ET in the
reporting month. No environmental non-compliance was recorded in the reporting month.
6.1.3 No environmental complaint, notification of summons or successful prosecutions was
received in the reporting month.
6.1.4 The ET would keep track on the EM&A programme to ensure compliance of environmental
requirements and the proper implementation of all necessary mitigation measures.
6.2 Recommendations
6.2.1 According to the environmental audits performed in the reporting month, the following
recommendations were made:
1. Water Impact
To maintain the cover for open stockpile of and exposed slope;
To keep reviewing and updating temporary drainage system;
To maintain the earth bunds or sand bag barriers on site to direct stormwater to silt removal
facilities;
To maintain and ensure the silt removal facilities are functioning properly;
To maintain the wheel washing facilities provided at every construction site exit where
practicable are functioning properly; and
To divert the muddy water at the retention pond to the wetsep for treatment before discharging
out.
2. Waste/Chemical Management
To check for any accumulation of waste materials or rubbish on site;
To avoid any discharge or accidental spillage of chemical waste or oil directly from the site;
To maintain the drip tray well to prevent oil and chemical leakage; and
To avoid improper handling, storage and disposal of oil drums or chemical containers on site.
WWF Hong Kong
Environmental Team for
EP-598/2022 Mai Po Nature Reserve Infrastructure Upgrade Project
Monthly EM&A Report June 2023
.
18
3. Ecology
To erect and maintain the protection fence around the retained trees / conservation species;
To keep the tree protection zone large enough to protect the tress; and
To remove the construction materials within the tree protection zone.
4. Landscape and Visual
To erect and maintain the protection fencing and tree protection zone around the preserved
trees;
To remove the construction materials within the tree protection zone; and
To keep the tree protection zone large enough to protect the tress.