Project: Mai Po Nature Reserve Infrastructure Upgrade Project – Tower Hides and Footpath
Indicative Construction Programme Date: 15 Oct 2023
W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4
Tower Hide 2 & 3 Works
Outdoor Works
Mobilization and site setup 17-Apr-23 29-May-23
Foundation construction 30-May-23 30-Jun-23
Steel structure installation 1-Jul-23 31-Aug-23
External ramp installation 15-Aug-23 30-Sep-23
External facade installation 1-Sep-23 15-Oct-23
Bird Season Bird Season
Footpath Works
Floor decking installation (Section 1s) 3-Jul-23 24-Jul-23
Floor decking installation (Section 2s) 25-Jul-23 8-Aug-23
Floor decking installation (Section 3s) 9-Aug-23 23-Aug-23
Floor decking installation (Section 4s) 24-Aug-23 7-Sep-23
Floor decking installation (Section 5s) 8-Sep-23 22-Sep-23
Floor decking installation (Section 6s) 23-Sep-23 11-Oct-23
Cleaning and defect rectification 12-Oct-23 15-Oct-23
Note:
[1] According to the Project EM&A Manual, the Project programme refers to the outdoor construction works of the Project only. According to the site audit on 16 October 2023, outdoor construction works were
not inspected. Therefore, the EM&A was terminated from 17 October 2023. There would be no outdoor works of the Project during bird season and internal works for the Tower 2 & 3 will be carried out during
bird season.