Method Statement and Management
Plan for the Design and Construction
of the Wooden Boardwalk
for
Mai Po Nature Reserve Infrastructure Upgrade
Project
(Environmental Permit No.: EP-598/2022)
May 2023
(Version 2.0)
Certified By Environmental Team Leader:
(Joan Choi)
Company: Ka Shing
Management Consultancy Ltd.
Table of Content
Page No.
1.0 Installation of Timber Decking with Adjustable Pedestal………..……….P.1 to P.2
2.0 EIA Report Reference…………………………………..……………… ..P.2 to P.5
3.0 Maintenance Plan…………………………………………………..……..P.6 to P.8
List of Appendices
Appendix A – Footpath Construction Phase Plan
Appendix B – Boardwalk Location Plan